Bathroom Renovation in Georgetown
Bathrooms are one of the most common renovations in Ontario, and the one that goes wrong fastest when the waterproofing is rushed. We take the room back to the studs where it needs it, fix what we find, and build it back up in the order that keeps water where it belongs.
average GTA bathroom renovation. Mid-range update without moving plumbing. Typical GTA figure, not a quote.
What's included
- Demolition and haul-away
- Plumbing rough-in changes and new fixtures
- Waterproofing behind tile and under the shower
- Wall and floor tile
- Vanity, toilet, mirror and accessories
- Exhaust fan, lighting and outlets
- Paint and final clean
The written quote lists exactly what your job includes.
Good to know
- Keeping the toilet and drain where they are keeps the cost down the most.
- Pick tile and fixtures before demolition starts, so the room isn't open while you wait on an order.
Questions people ask
How long will we be without the bathroom?
A standard update usually runs two to three weeks once work starts. If it's your only bathroom, tell us and we'll plan the order of work around it.
Can you turn a tub into a walk-in shower?
Yes. It's one of the most common changes. We'll check the floor drain and slope at the site visit.
Often done together
How it goes
Call or send the work order. We visit, measure and give you a written price. Then one schedule and one contact until the walk-through.